By combining 4-12/volt dc batteries the voltage can be increased to 48 volts meaning 4 times more efficient than for dc/ac inverter wattage drain from 12/volt inverters. By linking multiple sets of dc float voltage batteries a bank is formed. If an individual battery were to have a problem monitoring reporting would log the event as follows. By vendor monitoring reporting the bad cell dragging the others down can be pulled offline from bank dc float voltage. Microprocessor controlled battery banking where no one set in under or over charged of all dc float voltage set ready to cycle online as required.
Also by banking this voltage larger dc wattage loads can pull additional drain on the entire dc float voltage sets that are one line and ready for operation cycle. The battery banking acts like a giant capacitor giving motors and pumps a smoother startup on amperage pulls and loads. Smart switching microprocessor controlled, Web monitoring reporting with other options available like free vendor supplied software that can control vendor devices over the web.
All that banking just covers the DC side of (Mission Critical Off Grid Electrical Power)
The AC side is always Pure Sine Wave Electrical Power Inverters Single or 3 Phase. By Phasing Inverters for Either 1 inverter for 120/volt or 2 inverters for 120/240 volt or 3 inverters for 120/240/480 volt, and other options. The more that you rack and stack on each phase the more the total amp/wattage output increases. aka mini micro grid
Step Up Pad Mount Transformer dc battery float voltage to ac 7200/volts |
Many great benefits and massive amounts of free electrical power but even greater saving are possible by the higher the voltage the less the amp theories.
Example (wattage/voltage=amperage) 1-60/watt light bulb / 120/volts = 0.50 amps 60/watt light bulb / 240/volts = 0.25 amps. By increasing voltage the amp load is lowered. Wire cost is lowered by smaller wire sizes.
Example 120/240 volt main breaker panel is 48,000 watts at 7200/volts the same wattage load is lowered to 6.78/amps. 48000/7200=6.78
Step Down Pad Mount Transformer Onsite Wattage Requirements Banking Charging Options |
D B Electric can pre build/consult or project management your grid tied or off grid wattage requirements for Mission Critical Off Grid Electrical.
By these 2 sources of energy with smart switching lithium ion battery banking producing massive amounts of free electrical power for homes, small business owners, ranches, arigualculer & crop water pumping, off grid, anywhere. A Father & Son family owned/operated business with over 75 years combined of ac electrical contracting experience will provide you with clean safe and reliable pure sine wave electrical power. With our quality vendors and their products migrated into final operating micro grid dc to ac pure sine wave electrical power. Many options are available from pre built containerized units, to ONSITE Carte Blanche (Mission Critical Off Grid Electrical Power 7/24/365) get it operating as fast as possible right now Clients any where.