Programmable Logic Control aka PLC used for automation of electric motors,
contactors, relays, solenoids. In factories, industrial locations worldwide.
Timer Control Smart PLC Switching is very easy because devices only have to be wired ONCE and all switching programing is done over computer and stored in memory tecknowledgey. Meaning endless options in switching program updating, the wires stay the same but the program can change D B Electric blog about electrical power from a retired master electrician describes what can be accomplished with PLC automation devices. The switching possibilities are endless as well as monitoring, control, web controlled free worldwide, and yes endless options.
In short any electrical load can be configured to have PLC automation take control of it anywhere over the web for free meaning Timer Control Smart PLC Switching replaces
the standard dial timers used for years in business and factories, 4 kw 120/240 volt loads and all timing is pre programmed into PLC memory aka endless options. Catching on yet?
the standard dial timers used for years in business and factories, 4 kw 120/240 volt loads and all timing is pre programmed into PLC memory aka endless options. Catching on yet?
A good example for Timer Control Smart PLC Switching
A circuit breaker is designed to build up heat the more amps/wattage you throw at the circuit breaker the hotter that it becomes till it reaches it's trip-ing point. Or directly to ground in a dead short circuit issues. Most novice gardeners use 120/volt 1000 watt hps not realizing the actual amp load being generated and the heat build up at the Main Breaker location. wattage/voltage=amperage numbers do not lie 1000/120=8.33 amp draw. Double the voltage to 240/volts and the amp draw will be reduced by half. Rounded off it is a 9 amp pull for every light running at 120/volt.
I have heard stories of 25k a month or more for monthly utility electric bills and wonder why? There are large scale projects in the USA and worldwide that are using lithium ion dc batteries to make MV (1-MV=100,000) AC Primary Voltages that are Grid Tied. The utility companies are storing and charging batteries with this power in off peak hours and bringing it back ONLINE during peak hour demand.
This same technology can be scaled down to make mini microgrids that operate homes, business,ranches, farms, agriculture and water pumping, cabins, telecom, and any off grid wattage load requirement. It is very simple using the lithium ion battery banking, dc to ac microprocessor controlled pure sinewave inverters and PLC control. Single and 3 phase options are available to meet any KW demand.
DC Side Left Transformer Step Up Voltage to Primary 7,200 AC Right Transformer Step Down Is On Site Secondary AC Wattage Loads.
D B Electric can pre build a pure sinewave inverter system so you can have FREE ELECTRICAL POWER using PLC automation and lithium ion battery banking with solar and wind combined shipped to your location.
A little wisdom the higher the voltage the less the amp draw for the same wattage load being driven.
D B Electric
Profile Google+ https://plus.google.com/115768681412052855743
No comments:
Post a Comment