Off Grid Island Style Connection
Step Up Line Side |
The higher the voltage the less the amp draw for the same wattage being operated!
wattage/voltage=amperage
amperage X voltage=wattage
120 240 volt ac single phase 200 amp = 48000 watts
48000/240=200 amp load
7200 volt ac primary to lower amp draw
48000/7200=6.67 rounded off to 7 amp draw
Stepping up the ac input on line side of the off grid dc to ac inverter systems
(battery bank to dc to ac pure sinewave inverter single or 3 phase KW to KV)
Stepping down the load side of the offgrid onsite for secondary load outputs KV to KW
Step Down Load Side |
Just add solar-wind-battery banking storage options for charging and massive amounts of free electrical power is possible totally off grid out in wilderness. aka mini microgrid your own power plant.
PLC programmable logic controller makes even more switching options available. And PLC SCADA along with ATS automatic transfer switch to National grid possible in either KW or KV options for Net Metering.
Complete system control, monitoring, text/email alerts, security options, over the web with computer, cell options.
With the advancement in quality off the shelf stackable microprocessor controlled dc to ac inverters that are so fast that voltage transfers from one power source to another power source do not require computer/clock resets.
Cargo container setup makes fast ready to operate electrical power possible anywhere.
There is no reason to never have electrical power 7/24/365 that is free, safe, reliable. Retired master electrician can consult you on do it yourself kits. Or online/onsite options anywhere.
D B Electric
No comments:
Post a Comment